(1)
Akbari Lesbu, M.; Aminyavari, S. Analysis of Delay Factors in Post-Flood Reconstruction Projects: A Case Study of Gilan Province, Iran. Int. J. Res. Civ. Eng. AI 2026, 3 (1), 17-25. https://doi.org/10.48314/ijrceai.v3i1.39.